Sample Display of utilities installed in Legacy Blocks Inc blocks
Additional 3″ plumbing installation
Utility installation preparation prior to monolithic pour. 2x4s are place in cutout utility channels prior to pouring concrete. This will prevent the concrete from filling the cut-out channels that will be used for 3″ plumbing installations.
Plumbing channel
Channel was cut for placement of 2″ plumbing
Installation of electrical box